Removes large particles and organisms
Low pressure loss of only 0.1 - 0.5 BAR
Horizontal or vertical installation
Features
Advantages
334 m³
500 m³
1000 m³
2000 m³
Over the years, we have designed, built and commissioned many facilities in the field of marine energy. The list of equipment: battle, firefighting and multipurpose tugs, motor boats, transporter cranes, yachts, bulk ships.